Aller au menu Aller au contenu
29/06/2026 15:00 Réponse électronique obligatoire pour cette consultation, sans signature électronique. DUME défini par l'acheteur
2600957
Operating of a New Aviation Fuel Facility
The Contracting Entity wishes to appoint an experienced Operator to operate, maintain and manage the new Fuel Facility at the Airport. The Contracting Entity will remain owner of the Fuel Facility. The new Fuel Facility shall be operated by the Operator under the Open Access principle. The operating proposal for the new Fuel Facility is: • to operate, maintain and manage the new Fuel Facility for supply of JET A-1, so developed and built by the Building Contractor and the existing P10 cargo apron hydrant system for a fixed term of 10 (ten) years; • to undertake technical operational responsibilities for the provision of additives for supply of F34 for military/NATO use.
Portail des marchés publics

Temps restant pour répondre (délai d'acheminement inclus) : il y a 65 jour(s) 9 heure(s) 46 minute(s)

Temps d'acheminement avec un débit de 128 kbs, il faut 1 minute par Mo de réponse (estimation donnée à titre indicatif) En savoir plus

SE PREPARER A L'AVANCE A REPONDRE - N'ATTENDEZ PAS LE DERNIER JOUR

En savoir plus
Tester ma configuration Consultation de test
Aucune pièce n'a été jointe à cette consultation
Aucun résultat trouvé
Aucun résultat trouvé
Aucun résultat trouvé